Cleveland Recycling Plant

Cleveland, Ohio

Cleveland Recycling Plant

Behrent Engineering was contracted to provide electrical engineering services that would be necessary to install the electrical systems for a De-stoner and 5/8” lines at a recycling plant in Cleveland, OH.  The contract also included construction coordination and commissioning services.  The new electrical system included:

  • New 1200-amp service from a new utility-owned 1000kva pad mount transformer
  • New 480-volt electrical distribution equipment
  • Grounding for new building
  • Lighting for new building
  • New cable tray and conduit for power wiring
  • Distribution panel drawing
  • Power metering schematics
  • Electrical installation details
  • Equipment specifications (MCC, dry transformer, panel, fixtures)
  • Purchasing support